Skip to content
English
  • There are no suggestions because the search field is empty.

T-Series: T-BUS Metal Crate

TK RETURNABLE UNITS: DO NOT DISPOSE; MUST BE RETURNED

FULL SINGLE UNIT t bus
EMPTY COLLAPSED UNIT t bus collapsed
STACKED UNITS PREPARED t bus stacked

T- SERIES SET UP AND TEAR DOWN:

Minimum Required for Pickup: 24 Total Units

Preparing Units for Pickup: 

  1. Unit consists of 3 components ([1] steel shipping crate, [1]  Mounting gate –Post 1, [1] Mounting gate-Post 2).
  2. Follow instructions to collapse T-Series Crate.
  3. Be sure to return both mounting gate posts.
  4. Stack the empty units on top of each other (6 max due to height).

ACCESS FULL SOP: TK DEALER RETURNABLE CRATE FULL SOP

DEALER NOTICE: Loading assistance from Dealer/OEM is required for ALL Types of Returnable Packaging.

Contact EZRack to Schedule a Pickup when any one of these minimums are met or to report empty unit counts.

ALL HARDWARE MUST BE SECURED AND LOCKED INTO POSITION, AND ALL DUNNAGE MUST BE REMOVED. ENSURE CRATES ARE ALL STACKED IN THE SAME DIRECTION WITH PROPER ORIENTATION SO THE FORKLIFT CHANNELS ARE ACCESSIBLE.

Use the chat to submit counts now!